Glossary

Zero Touch Deployment

New equipment configures itself as soon as it's switched on and comes online at the location.

Also known as: ZTD, InControl, rollout without an engineer

The router or access point is linked to your environment in the management portal in advance. As soon as the device has power and internet, it fetches the correct settings, networks and firmware itself.

That saves an engineer visit and, more importantly, saves differences between locations. Every site gets exactly the same configuration, because it comes from a single central template.

Replacement after a fault works the same way: the new device takes over the role of the old one without anyone needing to configure it on site.

How we apply this

For multi-site customers we deliver prepared equipment that the on-site employee only has to plug in.

Tell us about your location, we take care of the rest.

A free site survey gives you clarity within a week: what is possible, what it costs and how quickly it can be live.